How Humidity and Temperature Change Everything
High Temperatures = Fast Cure, Shorter Working Time
- When working in summer months (especially July through September), 25–35°C can drastically shorten pot life.
- Polyaspartic coating in Vaughan may need to be rolled within 10–15 minutes.
- If you don’t adjust for it, your roller will be pulling half-cured chunks.High Humidity = Slower Topcoats, Foggy Finishes
- Southern Ontario sees 80%+ humidity during peak summer.
- In areas like Innisfil, Barrie, and Muskoka, excessive moisture can delay topcoat curing — and trap moisture underneath.
- This is especially risky for garage floor epoxy in Toronto and floor grinding services in Barrie where poor airflow is common.
Pro Tip: We use industrial-grade hygrometers and moisture meters on every job. You’ll never have to guess — we bring science to the site.
Client Story: From Disaster to Designer Finish
We recently completed a garage epoxy in Vaughan where the homeowner had previously hired a budget crew. The floor looked decent for a few days, but bubbles began surfacing within a week. The issue? No moisture test. No humidity control. Wrong cure window. Our Epoxy Boss team: Removed the failed layers; Performed a full concrete glue removal and moisture barrier in Aurora; Installed a polyaspartic flake system with slip resistance; Delivered a dust-free, mirror-finish floor in 48 hours. "I thought I had to rip the whole thing out again. These guys saved it — and now my garage looks better than my kitchen." — Ryan C., Vaughan
Why Epoxy Boss Inc. Is Ontario’s Cure-Time Master
When you work with us, you’re hiring more than a crew — you’re hiring a complete flooring system with precision built into every layer.
- Same team since 2019
- Over 100,000+ sqft installed for homes and commercial buildings
- North American tools and coatings only
- Moisture barriers, vapour suppression, and prep grinds always included
- Our team is WSIB-insured, uniformed, and trained to national safety standards